Upstream Slope
| Immediately after completion with full construction pore pressure | 1.3-1.5 |
| Following rapid drawndown (slip circles between high and low water levels) | 1.2-1.3 |
Downstream Slope
| Earthquake and Reservoir Full | 1.2 |
| Reservoir full - steady seepage | 1.5 |
In an area subject to earthquakes the following factors are indicative of acceptable values:
| Seismic coefficient | 0.1 | FoS | 1.8 |
| Seismic coefficient | 0.3 | FoS | 1.15 |