Refurbishment

The refurbishment of the third floor kitchen in the Deerness block was completed in October 2011. The improvement works included:

  • New work surfaces and cupboards
  • New ovens (x2), extractors (x2), hobs (x8) and sinks (x2)
  • Increased food preparation and storage space
  • A dishwasher

The pictures below show the planned design.