Estates

Projects

The Estates and Buildings Energy team plan and implement an array of energy saving projects throughout the University estate. These projects have variable pay backs and all save carbon emissions.

The posters describe some of the energy saving measures installed in several University buildings:

Arthur Holmes Building

Biological and Biomedical Sciences Building

Psychology LSSU Building

Van Mildert College

Chemistry 4 - Fume Cupboard Optimisation

The tables below highlight some of the projects which have been carried out or in progress along with their associated carbon savings.

Predicted Energy Savings through Energy Saving Initiatives and Engineering Services System Improvements

Summary Table of Savings - (See following tables for breakdown of savings)

Description

Predicted Annual Savings

(kWh)

Predicted Annual Savings

(£)

Predicted Annual Savings

(tonnes CO2)

Energy Saving Initiatives funded through the SALIX/HEFCE Green Revolving Fund

2008-09 (Year 1)

1,900,709

40,579

376.72

Energy Saving Initiatives funded through the SALIX/HEFCE Green Revolving Fund

During term 2009-10 (Year 2)

1,629,703

89,396

577.8

E&B Engineering Services - System Improvements

5,820,226

182,632

1,235.25

Total

9,350,638

276,085

2,189.77

Energy Efficiency Initiatives Funded through the SALIX/HEFCE Green Revolving Fund

Year 1 (2008-09)

Location

Project Description

Project Cost

(£)

Predicted Annual Savings

(kWh)

Predicted Annual Savings

(£)

Predicted Payback

(yrs)

Predicted Annual Savings

(tonnes CO2)

Hatfield, Collingwood, St. Hild & Bede and St. Mary's Colleges

Window Draught insulation

77,158

1,073,864

18,792

4.0

198.66

Bill Bryson Library

Upgrade lighting with energy efficient fittings

4,736

11,766

1,353

3.5

6.32

Bill Bryson Library

Voltage Optimiser

22,058

39,396

4,901

4.5

21.16

Plant rooms at Elvet Riverside, Science Site & 12 South Bailey

Insulation and valve covers

60,004

685,752

12,000

5.0

126.86

College of St Hild & Bede

Installation of Thermostatic Radiator Valves

3,666

69,827

1,221

3.0

12.92

Bio-Sciences Dept. Science Site

Installation of Reverse Osmosis Unit

7,108

20,104

2,312

3.0

10.8

Total

174,730

1,900,709

40,579

≈3.8

376.72

Energy Efficiency Initiatives Funded through the SALIX/HEFCE Green Revolving Fund

Year 2 (2009-10)

Location

Project Description

Project Cost

(£)

Predicted Annual Savings

(kWh)

Predicted Annual Savings

(£)

Predicted Payback

(yrs)

Predicted Annual Savings

(tonnes CO2)

Ogden Building, Josephine Butler College and Collingwood College

Boiler Management Controls

17,941

173,333

3,901

4.6

32.08

Bio-Sciences Dept. Green houses

Lighting Controls

1,395

42,048

4,836

0.3

22.58

Bio-Sciences Dept.

Voltage Optimiser

35,680

184,163

21,179

1.68

98.9

Physics, LSSU, Chemistry 1 & 11 (part), EGG, Van Mildert (part)

Voltage Optimisers Installation of electrical mains to buildings

227,612

548,013

54,801

4.16

298.1

Plant rooms at Brookes House, IMEIS, Queens Campus and Howland's Farm

Insulation and valve covers

23,396

682,146

4,679

5.0

126.2

Total

306,024

1,629,703

89,396

≈3.1

577.8

Estates and Buildings Engineering Services - System Improvements (2008-09)

Location

Project Description

Predicted Annual Savings

(kWh)

Predicted Annual Savings

(£)

Predicted Annual Savings

(tonnes CO2)

University Buildings on the Durham Peninsula

DHS1 - District Heating System De-Centralisation Project

2,082,289*

56,221*

403.96*

Bio-logical Sciences Dept. Plant Growth Rooms and Freezer Room.

Upgrade of Cooling, Ventilation (inc. 'Free-Cooling'), Lighting, Control Systems and building fabric to support Plant Growth and other research projects.

211,188

22,000

98.0

Arthur Holmes Building - HPC Computer Machine Room

Building, Electrical and Cooling system infrastructure upgrade including 'Free-Cooling' Chillers to support the expansion of high performance computing facilities and mission critical services.

Dependant on computer loads migrating onto cooling systems

Dependant on computer loads migrating onto cooling systems

Dependant on computer loads migrating onto cooling systems

Various Department and College Premises

Upgrade of External Lighting

158,505

13,472

82.0

University Colleges

Rationalising Heating times and the installation of Heating Extension Timer Control Panels

4,864,865

131,351

943.0

Engineering Building, Science Site

Heating System Improvements

53,737

1,450

10.0

St. Aidan's College Blocks

H-Q

Boiler Plant Replacement

108,760

2,936

21.1

St. Mary's College Williamson building en-suite Blocks

Boiler plant replacement and heating upgrade

61,545

1,660

11.0

Van Mildert College, Derwent Block

Year 4 of 5 of site wide boiler de-centralisation project

158,307

4,274

30.7

Grey College, Hollinside Block North and South.

Boiler Plant Replacement

203,319

5,489

39.45

Total

5,820,226

182,632

1,235.25

*Savings not included in totals as they will not be fully realised until this project is complete in 2011